Inga-Cabinda-Pointe Noire Power Translation
To prepare the feasibility study and tender documents for the power interconnection between DRC, Angola and Congo
To prepare the feasibility study and tender documents for the power interconnection between DRC, Angola and Congo
To engage consulting/advisory services to facilitate investment in the construction of the 360MW Kariba North Bank Extension power station.
To provide the technical and analytical basis for investments in generation, and transmissions projects and enhance EAPP staff skills.
To prepare the economic feasibility, detail engineering design and tender documents for the 5 cross border projects selected under the program.
To support the Governments of Ghana and Burkina Faso and their power utilities to update the feasibility study and carry out detailed engineering designs; conduct a preliminary Line route survey for 225 kV transmission; conduct an Environmental and Social Impact Assessment, and prepare Tender Documents.
To undertake feasibility study to investigate the technical feasibility and economic viability of the project, and prepare detailed ESIA studies for the inter-connector.
To support a Transaction analysis for Private Sector Participation in development and operation of energy systems in OMVG.
To support the Governments of Uganda and Kenya in engaging a private sector Strategic Partner for the development and management of the Kenya-Uganda Oil Pipeline.
To complete outstanding project development work: updating the feasibility study, undertaking due diligence with respect to the review of financial, technical and legal aspects of the project, and preparing a Project Information Memorandum (PIM) for presentation to public and private investors.
To support the Governments of Zambia, Tanzania and Kenya in engaging a Transaction Advisor to structure the project to allow private sector participation and reach financial and legal close.