EAC Railways Sector Enhancement project
To carry out a pre-feasibility study along the identified network and develop an investment plan for presentation to potential investors.
To carry out a pre-feasibility study along the identified network and develop an investment plan for presentation to potential investors.
To complete the feasibility study, detailed design and prepare Tender documents.
To undertake a feasibility study for a proposed natural gas pipeline from Dar es Salaam to Tango (Tanzania) and Mombasa (Kenya).
Capacity Building for RECs and other agencies.
To undertake an Economic, Financial and Technical Assessment (EFTA) that would define the bankability of the project and a PPP implementation plan.
Preparatory Activities will support EAC in engaging a consulting firm to undertake the detailed pre-investment analysis, and environmental and social management plan and prepare tender documents for the EAC-BIN project.
To engage consulting/advisory services to facilitate investment in the construction of the 360MW Kariba North Bank Extension power station.
To provide the technical and analytical basis for investments in generation, and transmissions projects and enhance EAPP staff skills.
To prepare a pre-feasibility study of the missing links along the corridor.
To undertake feasibility study to investigate the technical feasibility and economic viability of the project, and prepare detailed ESIA studies for the inter-connector.