EAC Rehabilitation Selected Road SC TRB
Feasibility Studies and Detailed Engineering Designs of Lusahunga-Rusumo (Tanzania) / Kigali (Rwanda) and Nyakanazi (Tanzania) / Rutunga (Burundi) Roads.
Feasibility Studies and Detailed Engineering Designs of Lusahunga-Rusumo (Tanzania) / Kigali (Rwanda) and Nyakanazi (Tanzania) / Rutunga (Burundi) Roads.
To carry out a pre-feasibility study along the identified network and develop an investment plan for presentation to potential investors.
To identify a private investor and project developer and move project forward to financial close and implementation.
To engage consultants for the development and preparation of strategic business plans and strengthening the operational capacity of Central Corridor Transit Transportation Facilitation Agency (TTFA).
Capacity Building for RECs and other agencies.
Preparatory Activities will support EAC in engaging a consulting firm to undertake the detailed pre-investment analysis, and environmental and social management plan and prepare tender documents for the EAC-BIN project.
To finalize Feasibility Studies to rehabilitate the Bujumbura-Ruhwa-Ntendezi-Gisenyi Road link on the North and South Transport Corridors of the two countries.
To provide the technical and analytical basis for investments in generation, and transmissions projects and enhance EAPP staff skills.
To prepare a pre-feasibility study of the missing links along the corridor.
To determine the optimum solution for the operation of a railway line between Issaka in Tanzania and Kigali (Rwanda) and Bujumbura (Burundi) as part of the “Central Transport Corridor” with a view to opening up Rwanda and Burundi. It will strongly focus on private sector participation at the implementation stage.