Multinational Luberizi – Kamanyola - Bukavu Road

To undertake feasibility studies and detailed engineering design aimed at improving transport infrastructure linked to the Central Corridor, a key corridor in East Africa providing landlocked countries and sub-regions with access to the port of Dar-es-Salaam in Tanzania. Improvement of this road section improves access of the eastern DRC to the Central Corridor through Burundi, which will in turn spur social economic development through lower transport costs and stimulation of economic activities in the sub-region.

220 kV (400kV) Uganda (Beni) – DR Congo (Beni-Bunia-Butembo) Power Interconnection Project

The proposed project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construction of a High Voltage transmission line and associated substations of Beni, Butembo, and Bunia and upgrade the Nkenda Substation. From Nkenda substation in Kasese Western Region of Uganda the line will continue up to Bunia and Butembo via Beni in the North Eastern region of DRC. The total distance of the line is estimated to 352.2 km. The estimated investment cost is USD 160 million.