ECCAS support Implementation of PACOB-PPI

The objective of the project is to support Cameroon, Congo, Gabon, and Equatorial Guinea in setting up a formal framework for the sustainable management of shared water resources, a water resources monitoring system, and to carry out two priority investment studies. The project activities are structured around three components: (i) Support for the creation of a Transboundary Basin Organization (TBO) and capacity building; (ii) Preparation of investment studies (taking into account gender aspects) and monitoring of water resources; and (iii) Project management.

Project for the Bridge on the NTEM Multinational KRIBI CAMPO-BATA

Conduct studies for: (i) determine the technical and economic feasibility of building a bridge over the Ntem River at Campo and the construction of a Single Border Control Post (SBCP) at the Cameroon/Equatorial Guinea border; (ii) design and detailed dimensioning of the bridge and the SBCP, and (iii) formulate legal, technical and financial recommendations for the management and operation of the future bridge, the SBCP and the Yaoundé-Kribi-Bata.