Conduct studies for: (i) determine the technical and economic feasibility of building a bridge over the Ntem River at Campo and the construction of a Single Border Control Post (SBCP) at the Cameroon/Equatorial Guinea border; (ii) design and detailed dimensioning of the bridge and the SBCP, and (iii) formulate legal, technical and financial recommendations for the management and operation of the future bridge, the SBCP and the Yaoundé-Kribi-Bata.

Sector
Total Cost
3069054
COMMITTED (US$)
3069054
Year of approval
Financial close
Sources of Downstream Financing
NEPAD-IPPF
Physical implementation status
Status