330 kV WAPP Ghana – Burkina – Mali Interconnection Project
1) To undertake a full feasibility study, prepare preliminary
engineering design and tender documents and,
2) To conduct an independent Environmental and Social
Impact Assessment (ESIA) and prepare a Resettlement
Action Plan (RAP) for the 330 kV WAPP Ghana –
Burkina – Mali Interconnection Project