Access Roads and Connection Routes to the Future Road-Rail Bridge Between the Cities of Brazzaville and Kinshasa

The objective of the assistance from NEPAD-IPPF is to finance the feasibility studies, detailed engineering designs, environmental and social impact assessments (ESIA) and preparation of bidding documents in view of the construction of the Yie - Maloukou Trechot road (26 km) and the upgrading of the Yie – Special economic zone of Maloukou Trechot road (23 km) in the Republic of Congo. The said activities to be carried out in the Republic of Congo also include Technical Assistance (TA) to the executing agency and related tasks, as well as auditing services.

Ubangi River Bridge

The activities for which the Bank’s assistance is requested aim at conducting feasibility studies and detailed engineering design for the construction of a bridge over the Ubangi River, and the implementation of the missing links in the road corridors Bangui-Zongo-Kisangani-Bujumbura and Kisangani-Kampala joining the Central Africa Republic (CAR), the Democratic Republic of Congo (DRC), the Republic of Burundi and the Republic of Uganda.

Central Africa Fiber Optic Backbone project -CAB Gabon

To conduct a comprehensive feasibility study that will covers the detailed technical designs, economic, financial, environmental and social aspects required for the Central African fibre optic backbone (CAB-Gabon) project to reach the bankable level. The CAB-Gabon will complete 1901.8 km fibre optic connectivity that will cover the remaining fourteen (14) missing links on the Gabonese national backbone project.

ECCAS support Implementation of PACOB-PPI

The objective of the project is to support Cameroon, Congo, Gabon, and Equatorial Guinea in setting up a formal framework for the sustainable management of shared water resources, a water resources monitoring system, and to carry out two priority investment studies. The project activities are structured around three components: (i) Support for the creation of a Transboundary Basin Organization (TBO) and capacity building; (ii) Preparation of investment studies (taking into account gender aspects) and monitoring of water resources; and (iii) Project management.

Project for the Bridge on the NTEM Multinational KRIBI CAMPO-BATA

Conduct studies for: (i) determine the technical and economic feasibility of building a bridge over the Ntem River at Campo and the construction of a Single Border Control Post (SBCP) at the Cameroon/Equatorial Guinea border; (ii) design and detailed dimensioning of the bridge and the SBCP, and (iii) formulate legal, technical and financial recommendations for the management and operation of the future bridge, the SBCP and the Yaoundé-Kribi-Bata.