WAPP North Core Interconnection
To update the previous Feasibility and ESIA studies made by Fichtner in 2007. To transport energy generated from Northern Nigeria and Burkina Faso with T-offsets to Niger and Benin (900 km transmission line).
To update the previous Feasibility and ESIA studies made by Fichtner in 2007. To transport energy generated from Northern Nigeria and Burkina Faso with T-offsets to Niger and Benin (900 km transmission line).