ZIZABONA Power Interconnection project
Feasibility Study of electricity transmission line in Zimbabwe, Zambia, Namibia,Botswana, how to structure power arrangements.
Feasibility Study of electricity transmission line in Zimbabwe, Zambia, Namibia,Botswana, how to structure power arrangements.
To complete outstanding project development work: updating the feasibility study, undertaking due diligence with respect to the review of financial, technical and legal aspects of the project, and preparing a Project Information Memorandum (PIM) for presentation to public and private investors.
To conduct Technical and Economic Studies for 400 kV transmission lines and substations for the evacuation of power from the proposed 600 MW Baynes Hydro Power Project (HPP) on the Cunene (Kunene) River, bordering Angola and Namibia, integrating into existing power transmission grids of the two (2) countries; specifically: (1) Undertake technical studies and compose technical design specifications of transmission lines, substations and associated auxiliary or ancillary equipment and systems; (2) Assess the commercial and financial (economic) viability of the entire transmission project thro
The objectives of the project are to prepare an optimised water resources development investment strategy and plan with the IWRM implementation roadmap for the Orange-Senqu River Basin and preparation of multipurpose project for implementation in the short term time frame. Climate resilience will be integrated in the planning and development of water infrastructure. Investment financing and resources mobilisation strategies will be developed in both cases. The project promotes capacity building and institutional development as part of the stakeholders’ consultation process.