Feasibility Study on Business Opportunities for Women in a changing energy value Ecreee-ECOWAS
Study Scope for Women to Establish Energy Based business in region
Study Scope for Women to Establish Energy Based business in region
Strengthen the cooperation and regional integration of OMVG member countries in the energy sector (particularly in the electricity subsector). Pre-investment studies of the Digan, Fello-Sounga, Kaléta and Sambangalou hydroelectric facilities and their connection to the OMVG 225 kV transmission network.
Examine the economic, financial and political feasibility of establishing and setting up the Fund for the Development and Financing of Infrastructure and Related Services in the ECOWAS Transport and Energy Sectors (ECOWAS-DETECF), and then define the operating modalities of the Fund.
The objective is to prepare a pre-feasibility study of the missing links along the corridors.
To update an earlier study on the Gambia River Bridge, including analysis of the economic viability of the project and preparation of an ESIA to facilitate resource mobilization for investment and implementation.
To prepare the economic feasibility, detailed engineering design and tender documents for the Rosso Bridge over the Senegal River between the two countrie
To prepare the economic feasibility, detailed engineering design and tender documents for the Kazungula Bridge over the Zambezi River and other key infrastructure facilities along the SADC north-south corridor within Botswana and Zambia.
To support a Transaction analysis for Private Sector Participation in development and operation of energy systems in OMVG.
The objective of the assistance from IPPF is to support the identification of an optimal alignment of the route within each member state of the Dakar-Abidjan Highway Corridor & to conduct the financial viability analysis and preparation of tender documents based on the choice of management model for the maritime link between Praia and Dakar.
The activities for which the Bank’s assistance is requested aim at conducting feasibility study and Public-Private Partnership (PPP) structuring for the construction and operation of a deep-sea in Buba, Guinea-Bissau. The studies also include the organization of a Development Partners round table towards the mobilization of resources needed for the physical implementation of the envisaged infrastructure.