Baynes Hydro-Power (Angola and Namibia) 400 kV Transmission Lines Project

To conduct Technical and Economic Studies for 400 kV transmission lines and substations for the evacuation of power from the proposed 600 MW Baynes Hydro Power Project (HPP) on the Cunene (Kunene) River, bordering Angola and Namibia, integrating into existing power transmission grids of the two (2) countries; specifically: (1) Undertake technical studies and compose technical design specifications of transmission lines, substations and associated auxiliary or ancillary equipment and systems; (2) Assess the commercial and financial (economic) viability of the entire transmission project thro

220 kV (400kV) Uganda (Beni) – DR Congo (Beni-Bunia-Butembo) Power Interconnection Project

The proposed project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construction of a High Voltage transmission line and associated substations of Beni, Butembo, and Bunia and upgrade the Nkenda Substation. From Nkenda substation in Kasese Western Region of Uganda the line will continue up to Bunia and Butembo via Beni in the North Eastern region of DRC. The total distance of the line is estimated to 352.2 km. The estimated investment cost is USD 160 million.

Ruzizi IV Hydroelectric Project

1) Conduct of technical and environmental studies & preparation of tender documents for the project (ii) Conduct of studies of the institutional and financial framework & study of project bankability 2) Preparation of the implementation of the project , assistance to promoters and countries concerned in the negotiation with the investor / developer & project management.